CYC Workday Chore List
Cabin 6 broken outlet cover
Patch Sheet Rock behind Bathroom stall doors in Cabin 5, 6, 4
Cabin 4 broken outlet cover
Tighten door knob in Cabin 2
Clothesline for Holder Dorm
Replace facial boards on Dining Hall porch
Splice bottom rail on Gazebo in front of X Building (2” x 6” x 8’)
Replace facial board on back of X Building (1” x 6” x 16’)
Replace broken window pane in X Building (2)
Replace closer on storm door in X Building cabin 12 & 14
Fix switch and outside light in cabin 12
Remove base board heaters in X Building
Remove ceiling heaters in bathrooms in X Building
Put in exhaust fans in bathrooms in X Building
Paint shelves in walk-in cooler
*Replace light fixtures on boardwalk with metal fixtures
*Replace light fixtures under gazebos with metal fixtures* (7 fixtures)
Patch tin roof on boardwalk
Replace top boards on rail on center Gazebo 2 – 1”x6”x16’
Cabin 14 – commode leaking around the base
|